5 Important Categories of Lot Sampling Plan (Information Systems)


December 17, 2018 admin 0 Comment

1. Lot acceptance.

2. Lot rejection.

We Will Write a Custom Essay Specifically
For You For Only $13.90/page!


order now

3. No decision.

If the outcome is (3), and a second sample is taken, the procedure is to combine the results of both samples and make a final decision based on that information.

3. Multiple sampling plans:

This is an extension of the double sampling plans where more than two samples are needed to reach a conclusion. The advantage of multiple sampling is smaller sample sizes.

4. Sequential sampling plans:

This is the ultimate extension of multiple sampling where items are selected from a lot, one at a dame and after inspection of each item a decision is made to accept or reject the lot or select another unit.

5. Skip lot sampling plans:

Skip lot sampling means that only a fraction of the submitted lots are inspected.

Value Analysis:

The Value Method was originally developed by Larry Mills of General Electric (GE) in 1943. It has been highly refined and honed by many over the years.

It employs highly efficient procedures that are consistent with sound management techniques and is tuned to achieve maximum performance in the minimum amount of time required.

As a complete and mature process with more than 50 years of successful application, it has been used in almost any endeavor contemplated.

The Value Method is a highly efficient and productive decision-making process and employs:

a. Systematic and organised procedural processes.

b. Creative methods to generate alternatives.

c. Essential functional approach.

d. Comparisons of worth as opposed to Life-Cycle Costs (defined as value).

Key Characteristics:

Several characteristics differentiate the Value Method from other techniques. These help ensure that the customer obtains the kind of product they need and want.

a. Value-based decision process

b. Uses functional approach

c. Follows a very systematic and organized “job plan”

d. Directs efforts towards maximum possible alternatives through creativity techniques.

In Value Analysis multifunctional teams (design, production engineering, purchasing, and quality) use a formalized process to identify alternative materials, manufacturing processes, and designs to improve function while reducing costs.